Jun 292017
 

So, there’s some work still to be done, for example making some extension leads for the run between the battery link harness, load power distribution and the charger… and to generally tidy things up, but it is now up and running.

On the floor, is the 240V-12V power supply and the charger, which right now is hard-wired in boost mode. In the bottom of the rack are the two 105Ah 12V AGM batteries, in boxes with fuses and isolation switches.

The nodes and switching is inside the rack, and resting on top is the load power distribution board, which I’ll have to rewire to make things a little neater. A prospect is to mount some of this on the back.

I had a few introductions to make, introducing the existing pair of SG-200 switches to the newcomer and its VLANs, but now at least, I’m able to SSH into the nodes, access the IPMI BMC and generally configure the whole box and dice.

With the exception of the later upgrade to solar, and the aforementioned wiring harness clean-ups, the hardware-side of this dual hardware/software project, is largely complete, and this project now transitions to being a software project.

The plan from here:

  • Update the OSes… as all will be a little dated. (I might even blow away and re-load.)
  • Get Ceph storage up and running. It actually should be configured already, just a matter of getting DNS hostnames sorted out so they can find eachother.
  • Investigating the block caching landscape: when I first started the project at work, it was a 3-horse race between Facebook’s FlashCache, bcache and dmcache. Well, FlashCache is no more, replaced by EnhancedIO, and I’m not sure about the rest of the market. So this needs researching.
  • Management interfaces: at my workplace I tried Ganeti, OpenNebula and OpenStack. This again, needs re-visiting. OpenNebula has moved a long way from where it was and I haven’t looked at the others in a while. OpenStack had me running away screaming, but maybe things have improved.